Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Okumura, Susumu; Miyawaki, Nobumasa; Kurashima, Satoshi; Yoshida, Kenichi; Fukuda, Mitsuhiro; Ishibori, Ikuo; Agematsu, Takashi; Nara, Takayuki; Nakamura, Yoshiteru; Arakawa, Kazuo
Proceedings of 17th International Conference on Cyclotrons and Their Applications (CYCLOTRONS 2004), p.410 - 412, 2005/00
A simple analyzing system has been developed to measure the energy spread of the beam extracted from the JAERI AVF cyclotron with an energy resolution of dE/E = 0.001%. The high analyzing power can be obtained with an existing deflecting magnet system in the transport line by installing three sets of slits with a minimum width of 0.01 mm and a beam intensity monitor with a Faraday cup and semiconductor detectors. These new instruments have been compactly designed to fulfill the geometrical condition of the existing beam diagnostic chambers, which are located at the object and image positions. Installation of the analyzing system was completed and a preliminary test has been carried out. This system will be used for optimization of the flat-top acceleration system to achieve the energy spread of dE/E = 0.02%, required for microbeam production.
Sato, Satoshi
JAERI-Research 2003-014, 223 Pages, 2003/09
no abstracts in English
Kosaku, Yasuo; Kuroda, Toshimasa*; Hatano, Toshihisa; Enoeda, Mikio; Miki, Nobuharu*; Akiba, Masato
JAERI-Tech 2002-078, 58 Pages, 2002/10
Shielding blanket for ITER-FEAT applies the unique first wall structure which is separable from the shield block for the purpose of radio-active waste reduction in the maintenance work and cost reduction in fabrication process. Also, it is required to have various types of slots in both of the first wall and the shield block, to reduce the eddy current for reduction of electro-magnetic force in disruption events. This report summarizes the achievement of such R&Ds as, slit grooving techniques for Be/DSCu/SS first wall panel and SS shield block, demonstration of Be armor joining to the real scal first wall panel, and demonstration of full scale first wall panel.
*; Komatsuzaki, Manabu*; Nishio, Satoshi; Koizumi, Koichi; Takatsu, Hideyuki
JAERI-Tech 96-031, 16 Pages, 1996/07
no abstracts in English
; Shibata, Katsuyuki; Isozaki, Toshikuni
JAERI-M 90-050, 106 Pages, 1990/03
no abstracts in English
;
Nuclear Instruments and Methods, 96, p.485 - 486, 1971/00
no abstracts in English